Tuesday 18 December 2012

WHAT I'VE HAVE LEARNED IN RUS104 STUDIO?

I have a wonderful experienced during RUS104 STUDIO. Frankly, being a student of HBP was freaking amazing ! There's so many things I have learned in RUS104 STUDIO. Honestly, I'm not gifted in drawing. I'm not an architect not even interior designer, but with the help of lecturers and friends, I try my best to do my project well and improve my talent. I am proud with all my works even though I can do better than before. 

Monday 17 December 2012

PROJECT 10 : EXHIBITION

This is our second last project where some of the best works among others that had been chosen will be display on that day, Exhibition day.

During the preparation..




me and dayah :)


During Exhibition Day ...


The colourful robot

master ceremony of the day, che and hamim

hamim, me, and dayang

my group members, group 1 & 12


















PROJECT 9 : INTEGRATED PROJECT

PROJECT 9a : Design Proposal-Batu Ferringhi Information Centre


BOARD 1 : 

Site Analysis

BOARD 2 :

Schematic Design-Presentation Drawings

BOARD 3 :

Design Concept-Presentation Drawings

BOARD 4 :

Material Selection & Building Services


The combination of the four boards

PROJECT 9B : DEVELOPMENT PROPOSAL


Student are required to prepare a report of Development Proposal of the Batu Ferringhi Information Centre. The proposal should consist the following elements :
  1. Purpose, goal and objective
  2. Background study and site analysis
  3. Proposed design develepment
  4. Construction Method, Material Selection and Building Services
  5. Elemental cost analysis
  6. Project Scheduling
Sorry ! there's no of softcopy of the report...

PROJECT 9C : CONCEPTUAL MODEL


Based on the design and dimensions of our Information Centre (Project 9A), we have build a conceptual model in 1:50 scale.


Here's our great model of Information Centre :







PROJECT 8 : (RE)VISITED

PROJECT 8a : COMMUNITY FACILITY & TOURISM ACTIVITIES


  • Consist of Location (key Plan, Location Plan, Layout Plan)
  • Site Analysis i. Sun Orientation, Prevailing Wind & Data ii. Views and Constraints
  • Photos and sketches on facilities & cultural attraction

Here's the outcomes :



PROJECT 8b : ENVIRONMENT & SPATIAL ANALYSIS


Based on Batu Ferringhi layout plan, we need to analyse :

  • Traffic & Circulation 
  • Noise & Other Pollution
  • Vegetation & Buffer Zone


Here's the outcomes :






PROJECT 7 : INTERLINKED

PROJECT 7A : ANALYSIS OF HBP SPACES


This is the first project we are in a group. We need to analyse HBP site which consist of Location (Key Plan, Location Plan & Site Plan), Sun Orientation and Prevailing Wind, Vegetations and Views, and Circulation (Vehicular & Pedestrian).



This is the example of Site Analysis

And the outcomes :



PROJECT 7B : SKYWAY/PEDESTRIAN BRIDGE

Based on the site analysis (best view, circulation, vegetation etc), we need to build a skyway to be linked with the HBP buildings. We have to draw the presentation drawings of the skyway which consist of plan, front elevation, rear elevation, and side elevation in 1:75 scale.




PROJECT 7C : SKYWAY STRUCTURAL MODEL

Based on the design and dimensions of our HBP Skyway (Project 7B), we have to build a structural model in 1:50 scale.

Here's our great model :







PROJECT 6 : PROJECT DEVELOPMENT

For this project, I've need to make a mind mapping complete with all relevant charts and figures from inception stage until occupational stage based on Royal Institute of British Architects (RIBA) plan of work 2007. This mind mapping present the process and my role as quantity surveryor in project development stage.


The outcomes :


PROJECT 5 : BLUEPRINT

Based on the model that I did in Project 4, sculpture, I need to draw the plan and elevations of my sculpture and I also need to produced isometric drawing. I found that its quite hard for me to do this project as my drawing skills is not really good enough. I've tried my best to do it especially isometric drawing.

Here's the outcomes :






Isometric drawing