Monday 17 December 2012

PROJECT 7 : INTERLINKED

PROJECT 7A : ANALYSIS OF HBP SPACES


This is the first project we are in a group. We need to analyse HBP site which consist of Location (Key Plan, Location Plan & Site Plan), Sun Orientation and Prevailing Wind, Vegetations and Views, and Circulation (Vehicular & Pedestrian).



This is the example of Site Analysis

And the outcomes :



PROJECT 7B : SKYWAY/PEDESTRIAN BRIDGE

Based on the site analysis (best view, circulation, vegetation etc), we need to build a skyway to be linked with the HBP buildings. We have to draw the presentation drawings of the skyway which consist of plan, front elevation, rear elevation, and side elevation in 1:75 scale.




PROJECT 7C : SKYWAY STRUCTURAL MODEL

Based on the design and dimensions of our HBP Skyway (Project 7B), we have to build a structural model in 1:50 scale.

Here's our great model :







No comments:

Post a Comment